Roofing
$20,000
Hartzion Enterprises Corp
Moshe N.
Kings County
Installation of pipe scaffolding, and roof protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
10 other permits at 325 Avenue U. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Installation of temporary needle and pipe scaffold beam as per plans. needle beam shall comply with the chapter #33 of the code. no changes in use egress or occupancy under this application.
Installation of mechanical system in conjunction with subsequent applicaiton b01086106. no change in use, egress or occupancy.
P.S. 004K: PROPOSED EMERGENCY GENERATOR - 250KW/313KVA 120/208V, 3 PHASE, 4 WIRE IN WEATHER/SOUND PROOF ENCLOSURE. This application is filed in conjunction with NB application filed under 2014 code.
Roof replacement, extrior siding replacement, window and door replacement, stoop and concretesteps replacement, railing replacement, concrete deck replacement, interior renovation. no change to use, e...