Other Permit — 3 COLUMBUS CIRCLE
Other
$60,000
Cjs Industries Inc
Gabriel Dagan
New York County
Work Description
Application filed for mechanical modifications/additions on the 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Other permits at this address
10 other permits at 3 COLUMBUS CIRCLE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Application filed for sprinkler additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for plumbing additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for sprinkler additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for plumbing additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for mechanical additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for mechanical additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for mechanical modifications/additions on the 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel