Solar Permit — 2904 MONTEBELLO CT
Solar
Not listed
Contact info hidden
Travis County
Work Description
Replace a 200 amp breaker to a 150 amp main breaker per the solar inspector and possibly a new meter can NO OTHER WORK this job has previous passed final inspection Austin energy solar inspector requested lowing the 200 amp to a 150 amp breaker in the outside main electrical service.
More Solar permits in Austin
Install new 5.67 KWDC solar system servicing new residential only. Bluebonnet
Electrical temporary disconnect required for solar energy system install. No changes to structure proposed.
Installation new 4.4kw solar DC system with new 11.92kwh energy storage system . Installation new 125A Service sub panel
Installation of 60.72 kW solar panel system on existing metal structure. I was instructed by commercial permit review to file for an AUX permit for this project as it is located in the Austin 2 mile E...
Electrical temporary disconnect required for solar energy system install. No changes to structure proposed. EP Added and AUX removed as this is BlueBonnet electrical service