New Construction Permit — 2610 REED ST
New Construction
Not listed
Gilad Bergerin
Orapallo Mary Ann
Philadelphia County
Work Description
New Construction - FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
More New Construction permits in Philadelphia
New construction, addition, GFA change - FOR THE PARTIAL DEMOLITION OF AN ATTACHED BUILDING. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS
New construction, addition, GFA change - FOR THE ERECTION OF A PERGOLA OVER AN EXISTING ROOF DECK ON AN EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS.
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION...
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION...
New Construction - FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A 2 INCH WILKINS 950XLT2BFSS BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WI...