Other Permit — 245 PARK AVENUE
Other
$18,000
Soh Par Sprinkler Llc
Gianna Pilalis
New York County
Work Description
Removal of existing sprinkler system with installation of a temporary loop on the 14th floor as per plans. No change to use, egress or occupancy.
Other permits at this address
10 other permits at 245 PARK AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Structural framing and stair opening, as per plans. No change to use, egress, or occupancy.
Structural framing and stair opening, as per plans. No change to use, egress, or occupancy.
Installation of new plumbing and sprinkler fixtures and fire hose station removal and installation
Installation of new plumbing and sprinkler fixtures and fire hose station removal and installation
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel