Other Permit — 211 COLUMBUS AVENUE
Other
$47,364
Steadfast Development And
Dmitry Gimmelberg
New York County
Work Description
Removal of interior non load bearing partitions, flooring, ceilings and finishes per plans filed herewith. No change in egress, use or occupancy.
Other permits at this address
9 other permits at 211 COLUMBUS AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egre...
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egre...
Removal of interior non load bearing partitions, flooring, ceilings and finishes per plans filed herewith. No change in egress, use or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel