Other Permit — 189 8 AVENUE
Other
$430,000
Donald R Borg Construct
Steve Dluzyn
New York County
Work Description
2nd street-- general construction inclusive of interior partitions modifications as per plans filed herewith. no change to use, egress, or occupancy.
Other permits at this address
10 other permits at 189 8 AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
2nd street-- general construction inclusive of interior partitions modifications as per plans filed herewith. no change to use, egress, or occupancy.
Illuminated non-advertising accessory wall sign - 2nd street. no change of use, egress or occupancy.
Non-illuminated non-advertising double-face projecting accessory sign - 2nd street. no change of use, egress or occupancy.
Illuminated non-advertising accessory wall sign - 2nd street. no change of use, egress or occupancy.
Non-illuminated non-advertising double-face projecting accessory sign - 2nd street. no change of use, egress or occupancy.
2nd street-- plumbing modifications and installations in conjunction with retail build out.
2nd street-- modifications to existing sprinkler system in conjunction with retail build out. no change to use, egress, or occupancy.
2nd street-- mechanical modifications and installations for retail buildout.
2nd street-- mechanical modifications and installations for retail buildout.
2nd street-- modifications to existing sprinkler system in conjunction with retail build out. no change to use, egress, or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel