Other Permit — 1857 WALTON AVENUE
Other
$462,000
Conrock Construction Llc
Derrick Lovett
Bronx County
Work Description
Propose installation of heat pumps, heat exchangers tanks, circulating pump, fan coils and associated duct work as per plan in conjunction with Alt-CO-GC # X00781082-I1.
Other permits at this address
6 other permits at 1857 WALTON AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
St work in conj w/ alt-co # x00781082 to gutt rehab an existing masonry structure with floor system, including replacement of the existing structural & nonstructural building elements such as rotted f...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
More Other permits in Bronx
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
St work in conj w/ alt-co # x00781015-i1 to gutt rehab an existing masonry structure with floor system, including replacement of the existing structural & nonstructural building elements such as rotte...
Propose to gut rehab an existing masonry structure with floor system, including replacement of the exist. structural & nonstructural bldg. elements such as rotted floor joists, rusted header, and dama...
Replacement of gas explosion damaged 4 exterior cmu, 6 elevator shaft cmu and 4 public hallway walls on 16th & 17th floors where shown on approved plans. no change in use, egress or occupancy.
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.