Other Permit — 155 WEST 68 STREET
Other
$300,000
B N J Construction Corp
Amir Weinberg
New York County
Work Description
Combining apartment numbers 1612 and 1614/1615 on the 16th floor as per tppn 3/97. no change in use, occupancy or egress.
Other permits at this address
9 other permits at 155 WEST 68 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Installation of outriggers for facade repair and inspection
Facade repairs, including brick replacement, lintel cleaning, lintel replacement, and coping replacement. no change in use, egress or occupancy.
Facade repairs, including brick replacement, lintel cleaning, lintel replacement, and coping replacement. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Combining apartment numbers 1612 and 1614/1615 on the 16th floor as per tppn 3/97. no change in use, occupancy or egress.
Combining apartment numbers 1612 and 1614/1615 on the 16th floor as per tppn 3/97. no change in use, occupancy or egress.
Plumbing work in conjunction w/ combining apartment numbers 1612 and 1614/1615 on the 16th floor as per tppn 3/97. no change in use, occupancy or egress.
Plumbing work in conjunction w/ combining apartment numbers 1612 and 1614/1615 on the 16th floor as per tppn 3/97. no change in use, occupancy or egress.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.