Roofing Permit — 140 WEST 57 STREET
Roofing
$1,000
Spring Scaffolding Llc
Brian Altman
New York County
Work Description
Installation of temporary roof protection as per plan. no change in use,egress, or occupancy.the roof protection at the east neighbor's roof and rear yard.
More Roofing permits in Manhattan
CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK PLATFORM AND NEW GRATING ON UPPER LEVEL OF TANK PL...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...