Demolition Permit — 1301 AVENUE OF THE AMERICAS
Demolition
$27,990
L&K Partners, Inc
Craig Lindgren
New York County
Work Description
Demolition of metal stair from 39th to 40th floor. Infill of existing slab openings on 40th floor with new slab construction supported by steel beams. (Area of work approx. 300 square feet. No change in use, egress or occupancy.
Other permits at this address
10 other permits at 1301 AVENUE OF THE AMERICAS. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Minor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.
Minor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.
New interior office renovation includes new perimeter offices, conference rooms, and reception area.
New interior office renovation includes new perimeter offices, conference rooms, and reception area.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
More Demolition permits in Manhattan
Herewith filing for structural demolition work as per plans. no change to use egress or occupancy under this application.
Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy.
Demolition of non-structural facade finishes and substructure. Removal of existing backlit signage. Installation of new facade finishes. No change of use group, occupancy, zoning or egress.
Structural and construction work to replace existing first floor and eighth floor rtu's with split systems. New cassettes to be installed at first and eighth floors. See mechanical drawings. Demolitio...
Interior renovation of 3rd floor commercial space. Work to include minor non structural demolition. no change in use, egress and occupancy