Other Permit — 1177 AVENUE OF THE AMERICAS
Other
$10,780
Psi Partners, Llc
Mark Cornachio
New York County
Work Description
Modification to existing sprinkler system. Installation of sprinkler temp loop. 14th floor construction/15th floor marketing
Other permits at this address
8 other permits at 1177 AVENUE OF THE AMERICAS. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Removal and Installation of non load bearing partitions as per plans filed herewith. No change in use egress or occupancy. 14th floor construction /15th floor marketing
Removal of plumbing fixtures as per plans filed herewith.
Modification to existing sprinkler system. Installation of sprinkler temp loop. 14th floor construction/15th floor marketing
Removal and Installation of non load bearing partitions as per plans filed herewith. No change in use egress or occupancy. 14th floor construction /15th floor marketing
Filing herewith for the removal of HVAC ductwork as per plans filed herewith. 14th floor construction/15th floor marketing
Filing herewith for the removal of HVAC ductwork as per plans filed herewith. 14th floor construction/15th floor marketing
Build out of interior non-bearing partitions and related finishes, hung ceilings and relatedwork, as per drawings filed herewith. no change in use, egress or occupancy.
Build out of interior non-bearing partitions and related finishes, hung ceilings and relatedwork, as per drawings filed herewith. no change in use, egress or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel