Renovation Permit — 104 WEST 29 STREET
Renovation
$974,075
Cercone Exterior Rest Cor
Zachary Smith
New York County
Work Description
Facade repairs as per plans filed herewith. no change, to use, egress or occupancy.
Other permits at this address
9 other permits at 104 WEST 29 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Facade repairs as per plans filed herewith. no change, to use, egress or occupancy.
The scope of work re-using the existing hvac system and re-balance all the existing air terminals for the space. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
The scope of work re-using the existing hvac system and re-balance all the existing air terminals for the space. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Alteration of existing sprinkler system as per plans filled herewith. proposed sprinkler system is designed as per nfpa 13, as modified by nyc bc appendix q.
Alteration of existing sprinkler system as per plans filled herewith. proposed sprinkler system is designed as per nfpa 13, as modified by nyc bc appendix q.
More Renovation permits in Manhattan
Interior renovation & combination of existing apartments 6a & 6b on the 6th floor, as per with tppn 3/97. work to include partition changes and lighting. no change in use egress or occupancy.
Interior renovation of apt. 10b on the 10th floor. no change to use, egress, or occupancy.
Structural work filed to install new steel lintels, masonry infill and slab repair.
Proposed renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egress.
Facade repairs as per plans filed. no change in use or egress under this application.