Demolition Permit — 101 CENTRAL PARK WEST
Demolition
$457,860
Hite Construction Inc
Joshua Mandel
New York County
Work Description
Interior renovation of existing duplex apartment #16 - 17A. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
Other permits at this address
10 other permits at 101 CENTRAL PARK WEST. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Plumbing work in the existing unit #10F on the 10th floor. Initial general construction application and subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress,...
General construction work is proposed in the existing unit #10F on the 10th floor. Subsequent plumbing and mechanical applications to be filed. All per submitted plans. No change to use, egress, or oc...
General construction work is proposed in the existing unit #10F on the 10th floor. Subsequent plumbing and mechanical applications to be filed. All per submitted plans. No change to use, egress, or oc...
Mechanical work associated with unit 8a on the 8th floor renovation.
Interior renovation on existing apartment 8a on the 8th floor as per plans. millwork, flooring, kitchen and bathroom finishes . no change in occupancy, use or egress. plumbing,mechanical, and structur...
Structural work associated with renovation of unit 8a on the 8th floor.
General construction work as shown on plans
Mechanical work associated with unit 8a on the 8th floor renovation.
Interior renovation on existing apartment 8a on the 8th floor as per plans. millwork, flooring, kitchen and bathroom finishes . no change in occupancy, use or egress. plumbing,mechanical, and structur...
General construction work as shown on plans
More Demolition permits in Manhattan
Herewith filing for structural demolition work as per plans. no change to use egress or occupancy under this application.
Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy.
Demolition of non-structural facade finishes and substructure. Removal of existing backlit signage. Installation of new facade finishes. No change of use group, occupancy, zoning or egress.
Structural and construction work to replace existing first floor and eighth floor rtu's with split systems. New cassettes to be installed at first and eighth floors. See mechanical drawings. Demolitio...
Interior renovation of 3rd floor commercial space. Work to include minor non structural demolition. no change in use, egress and occupancy