Demolition Permit — 1 Post St
Demolition
$1,420,000
Nicholas Siriban
San Francisco County
Work Description
project scope is to renovate the 19th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meeting
Nicholas Siriban filed a demolition permit at 1 Post St with no contractor listed.
More Demolition permits in San Francisco
building c-12: asbestos abatement. demolition under separate permit. (771-783 missouri st)
unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 inches including show...
demolish 1-story, type 5, mixed use, commercial and residential.
3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms...
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.