Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 449 87th street.
Removal of interior finishes at cellar and 1st floor. Removal of selected portions of 1st floor facades, enlargements of windows and door openings, and new windows, doors, and exterior finish, as show...
Alteration to Floors Cellar, 001-008, and Roof with change to certificate of occupancy per plans filed herewith.
Alteration to Floors Cellar, 001-008, and Roof with change to certificate of occupancy per plans filed herewith.
Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 441 87th street.
Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 470 86th street.
Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 441 87th street.
Hereby filing new partial height interior non-load bearing stud wall, and entry check-in doors within an existing gym. no change in occupancy, use or egress
Convert existing office into residential units on 2nd to 14th floor as per plan. and obtain new c of o.
Hereby filing new partial height interior non-load bearing stud wall, and entry check-in doors within an existing gym. no change in occupancy, use or egress
Convert existing office into residential units on 2nd to 14th floor as per plan. and obtain new c of o.
Submit emergency generators plan in conjunction with alt-1 application#m01109601-i1.
Submit emergency generators plan in conjunction with alt-1 application#m01109601-i1.
Installation of footing for new steel posts.
Installation of footing for new steel posts.
The removal of the existing playground fencing and gates to be replaced with new perforated metal panel fencing and gates in coordination with new footings.
Filing to install a construction fence for The Boys Club.
Filing to install a construction fence for The Boys Club.
The removal of the existing playground fencing and gates to be replaced with new perforated metal panel fencing and gates in coordination with new footings.
Foundation work for NB