Sirina Fire Prot Corp
Permits (131)
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...
Installation of new Plumbing fixtures and modifications to Sprinkler Systems as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, egress or occupancy. F...
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with a dedicated novac 1...
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with a dedicated novac 1...
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with a dedicated novac 1...
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Installation of a temporary air-pressurized standpipe system at the columbia university - berrie medical science expansion as per plans submitted herewith, no change in use, egress or occupancy group.
Install a pre-action sprinkler system at the 2nd floor and provide sprinkler coverage to the IT rooms and upgrade existing sprinkler infrastructure by adding floor control assemblies
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Installation of a temporary air-pressurized standpipe system at the columbia university - berrie medical science expansion as per plans submitted herewith, no change in use, egress or occupancy group.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Install a pre-action sprinkler system at the 2nd floor and provide sprinkler coverage to the IT rooms and upgrade existing sprinkler infrastructure by adding floor control assemblies
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for ba...
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for ba...