Dynamic Development And C
Permits (38)
Installation of outrigger beams (needle beams) to support scaffold & roof protection as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Engineered Enclosure to be installed on supported scaffold as shown on drawings in conjunction with NB# B01043157 .
Engineered Enclosure to be installed on supported scaffold as shown on drawings in conjunction with NB# B01043157 .
Installation of outrigger beams (needle beams) to support scaffold & roof protection as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Subsequent structural application in conjunction with gc #b01043157-i1
Subsequent foundation application in conjunction with gc #b01043157-i1
Subsequent foundation application in conjunction with gc #b01043157-i1
Subsequent structural application in conjunction with gc #b01043157-i1
Site specific engineered enclosure system for overhead protection of adjoining property
Nb application- 16 family 6 story with cellar residential
Nb application- 16 family 6 story with cellar residential
Site specific engineered enclosure system for overhead protection of adjoining property
Subsequent support of excavation application in conjunction with gc # b01043157-i1
Subsequent support of excavation application in conjunction with gc # b01043157-i1
Full demolition of detached one story one car garage.
Full demolition of detached one story one car garage.
Full demolition of detached two story with basement and attic frame story building
Full demolition of detached two story with basement and attic frame story building
Installation of mechanical system for entire building in subsequent to new building application b08022562. no change of use, egress or occupancy under this application.
Installation of mechanical system for entire building in subsequent to new building application b08022562. no change of use, egress or occupancy under this application.