Celtic Services Nyc Inc
Permits (22)
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Install retaining wall as per plans, no change in use, egress or occcupancy
Install 8' high plywood construction fence
mechanical equipment will be placed on grade, and chute will be installed to lower debris from floor to floor
mechanical equipment will be used from exterior and placed on grade. Chute will be built up to assist with loading out of demo debris
mechanical means will be used to assist with exterior demolition. Chute will be built up to load out debris from floor to floor
mechanical equipment will be used to assist with demolition from exterior, and chute will be built up to lower debris from floor to floor
installation of construction fence
installation of construction fence
installation of construction fence
installation of construction fence
Full demolition of 4 story building using mech means to assist
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Partial demolition means & methods in conjunction with alt1 job 123700628
Herewith filing plans for a construction fence to be erected in compliance with 2022 NYC BC 3307.7 (Fences), and 1618 Loads on Temporary Installations. No changes to use, egress, or occupancy.
full demolition of 6 story structure by hand and mechanical means to assist from exterior on grade.
Installation of shoring as per plan; no change in use, egress or occupancy under this application
Install 8' high plywood construction fence
Soldier piles and timber lagging in conjunction with installation of a retaining wall