Armon Mechanical Inc
Permits (23)
Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 6th floor as per plans. No change to use, egress or occupancy.
Modification of existing sprinklers and addition of a second sprinkler control valve.
Sprinkler work on the 10th floor (Dubin & Co.) as indicated on drawings.
Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floor), the existing 4 g...
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.
Sprinkler head changes as indicated on plans.
Plumbing work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Sprinkler work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
modifications to existing plumbing system. no change in use occupancy or egress
Sprinkler work alt2 herewith for 18th floor interior alteration. no change is use, occupancy or egress
To install new sprinkler heads and branch piping on the 3rd & 4th floors as per plans. no change in use, occupancy or egress.
Filing sp for work related to interior alteration and fitout of 2nd floor of assembly restaurant
Plumbing scope related to Interior office renovation at the 8th, No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 8th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 10th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 10th floor as per plans. No change to use, egress or occupancy.